Last cladding panel of Burj Dubai ready for installation

Panel number 24348, the last piece of glass cladding that will complete the exterior of Emaar Properties’ Burj Dubai, the world’s tallest building, is now ready and awaiting installation.

Arabian Aluminium Company - a member of Al Ghurair Construction Industries LLC, started work on the exterior cladding of Burj Dubai in April 2007 and is now entering the final phase of cladding with the manufacture of the six-metre long last panel for the tower. The panel will be transported to the Burj Dubai work site for installation in the coming weeks.

The main materials used in the cladding are reflective glazing, aluminium mullions and textured steel spandrels with vertical stainless steel tubular fins. The cladding accentuates Burj Dubai’s height while lending it a shimmering slenderness. Panels of more than 18 different strength specifications and over 200 sizes are being used for Burj Dubai, all of them double-glazed and factory-sealed.

This is the first time that Arabian Aluminium Company has worked on a project of this scale and took great care to ensure that each manufactured panel that left their factory met the highest standards and strictest specifications.

Currently standing at over 800 metres and scheduled to open this year, Burj Dubai is at the centre of Downtown Burj Dubai, a 500-acre mega project described as the new heart of the city of Dubai.

Date: 28-07-2009

Tell a friend

Tell a friend or colleague: Fill in your details and those of the recipient and we will send them an email invitation to look at this page.

Friend's details

Your details